Contractor | Thompson Bros. (Constr.) LP, Spruce Grove, Alberta |
---|---|
Project | Construction of 2100m asphalt-surfaced runway, taxiways and apron, a 7.5km access road through muskeg and clay soils, instrument landing system infrastructure, and terminal building. |
Contract | Time and materials. |
Value | $65 million. |
Duration | 12 months. |